low |
Hutton Street |
|
18/09/2024 8:00am |
18/09/2024 6:00pm |
O2 (UK) Limited |
low |
Gainsborough Avenue |
reset traffic sign post |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Gainsborough Avenue |
renew concrete at CATV box |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Gainsborough Avenue |
ramp over tree roots - some flags may need enveloped relay 11 x 0.600 and 3 x 0.600 cuts relay 7 x 0.900 renew concrete 0.600x0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Gainsborough Avenue |
renew 3 x 0.900 and 2 x 0.600 relay 1 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
medium |
Gainsborough Avenue |
fill potholes with bitmac |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Gainsborough Avenue |
relay 4 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Gainsborough Avenue |
renew 1 x 0.900 saw cutting required |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Gainsborough Avenue |
renew 1 x 0.900 |
12/09/2024 8:00am |
16/09/2024 7:00am |
South Tyneside Council |
low |
Lorrain Road |
renew concrete around bollard |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Hexham Avenue |
|
11/09/2024 3:17pm |
17/09/2024 11:59pm |
Northumbrian Water |
high |
Sunderland Road |
bitmac 2 potholes in carriageway |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Turner Avenue |
renew concrete at bollard |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
East Boldon Road |
relay 1no 0.900 renew 1no 0.900 2no 0.600 in footway |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
East Boldon Road |
reset kerb in footway |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Temple Street |
|
13/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
low |
Mill Lane |
fill potholes at 3 utility covers in carriageway |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Mill Lane |
bitmac required around side entry gully |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Woodlands Drive |
reset kerb at gully |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
West Meadows Road |
reset footway 3mx1.65 renew 3no 0.900 2no 0.750 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
West Meadows Road |
replace piece of broken flag some with bitmac |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
West Drive |
replace damaged concrete carriageway with bitmac 1mx0.8mm |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
renew 1 x 0.900 relay 1 x 0.900 and 2 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
medium |
West Drive |
remove loose concrete carriageway and replace with bitmac 2mx2m |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
fill depression in footway with bitmac |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
renew 1.8x2.5 section of damaged concrete- saw cutting required |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
renew 1 x 0.900 relay 3 x 0.900 relay 3 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
relay 2 x 0.900 relay 1 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
renew 1 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
renew 0.600 x 0.600 section of concrete |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
renew 1 x 0.900 relay 1 x 0.900 relay 2 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Elgin Street |
relay 1 x 0.900 relay 2 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Cleadon Lane |
|
18/09/2024 8:00am |
20/09/2024 6:00pm |
BT |
low |
Sunderland Road |
bitmac 12 potholes in carriageway |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Access Road To Hedworthfield Primary School |
|
18/09/2024 9:30am |
20/09/2024 3:00pm |
BT |
low |
Johnston Avenue |
renew tarmac once flagging has been done. 2.5x0.150 saw cutting required |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Johnston Avenue |
renew 1 x 0.900 relay 2 x 0.600 |
12/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Mile End Road |
fill missing cobble with bitmac |
11/09/2024 11:00am |
13/09/2024 5:00pm |
South Tyneside Council |
medium |
Prince Consort Road |
|
12/09/2024 12:00am |
13/09/2024 11:59pm |
Northumbrian Water |
low |
South Shields Footpath 913 |
|
17/09/2024 12:00am |
20/09/2024 11:59pm |
Northumbrian Water |
medium |
Hedworth Lane |
|
16/09/2024 8:00am |
18/09/2024 6:00pm |
BT |
low |
Dartford Road |
|
16/09/2024 12:00am |
17/09/2024 11:59pm |
Virgin Media |
low |
Stanhope Road |
|
13/09/2024 12:00am |
16/09/2024 11:59pm |
Virgin Media |
low |
Market Place |
|
19/09/2024 12:00am |
23/09/2024 11:59pm |
Virgin Media |
low |
Prendwick Avenue |
CAF scheme to lower kerbline, F2F and replace two bollards |
17/09/2024 8:00am |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Green |
relay 2 x 0.900 relay 3 x 0.600 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Dundee Court |
relay 3 x 0.900 relay 6 x 0.600 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Edinburgh Road |
reset sign post |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Dundee Court |
close gaps in flags relay 7 x 0.900 relay 10 x 0.600 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Dundee Court |
close gaps in flags relay 7 x 0.900 relay 10 x 0.600 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Edinburgh Road |
reset hoops and replace 4 x red 60mm blocks |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Dundee Court |
renew concrete fillet |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Edinburgh Road |
relay 3 x 0.600 relay 2 x 0.900 renew concrete at base of lamp column |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Edinburgh Road |
renew 1 x 0.600 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Edinburgh Road |
replace 0.900 with C30 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Dundee Court |
remove 1 x 0.600 and replace with C30 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Dundee Court |
relay 2 x 0.600 renew concrete fillets at 2 BT boxes |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Edinburgh Road |
replace 1 x 0.900 with C30 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Lanark Drive |
repair 2 kerb with rapid set. |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Edinburgh Road |
ramp over tree roots relay 12 x 0.600 relay 5 x 0.900 excavate bitmac and replace with concrete 0.5sqm |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Fife Avenue |
renew surface course after kerb job 0.9x0.4 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Edinburgh Road |
renew 2 x 10x5 halfbat kerbs - one is a cut relat 2 10x5 half bat kerbs |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Fife Avenue |
relay 1 x bullnose kerb |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Fife Avenue |
excavate damaged bitmac and renew with 6mmS/C (4x0.6) |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Marsden Road |
replace 4no0.600 and 1no0.900 with nitmac |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Tracey Avenue |
|
13/09/2024 12:00am |
17/09/2024 11:59pm |
Virgin Media |
low |
Marsden Road |
cut back and renew 2 areas of damaged flexible footway3mx1m,2.4mx1m replace raised 6no 0.600 flagstones with bitmac replace 1no kerb with bitmac |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Marsden Road |
replace 2 no raised 0.600 with bitmac |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Fhed 42 |
|
09/09/2024 7:33pm |
19/09/2024 11:59pm |
Northern Gas Networks |
low |
Australia Grove |
|
12/09/2024 12:00am |
13/09/2024 11:59pm |
Virgin Media |
low |
River Drive |
|
19/09/2024 12:00am |
23/09/2024 11:59pm |
Virgin Media |
low |
Market Place |
|
19/09/2024 12:00am |
23/09/2024 11:59pm |
Virgin Media |
low |
Market Place |
|
19/09/2024 12:00am |
23/09/2024 11:59pm |
Virgin Media |
low |
North View |
|
18/09/2024 12:00am |
20/09/2024 11:59pm |
Virgin Media |
low |
Rosebery Avenue |
|
09/09/2024 11:30am |
13/09/2024 11:59pm |
Northern Powergrid |
low |
Moreland Road |
|
12/09/2024 12:00am |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Nicholas Avenue |
|
09/09/2024 10:10am |
13/09/2024 11:59pm |
Northern Powergrid |
medium |
Perth Avenue |
fill potholes with bitmac- remove loose material first |
10/09/2024 8:00am |
12/09/2024 11:59pm |
South Tyneside Council |
low |
Woodside Way |
|
12/09/2024 12:00am |
13/09/2024 11:59pm |
Virgin Media |
medium |
Perth Avenue |
fill pothole at gulley |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill 2 x potholes and top up depression to remove exposed ironwork 0.9x0.9 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill 4 potholes with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill 5 potholes with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
renew 1 x 0.900 and 1 x 0.600 renew 1 x tactile relay 5 x 0.600 relay 1 x 09.00 renew concrete fillets at 2 BT boxes |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Vespasian Street |
|
07/09/2024 2:00pm |
18/09/2024 11:59pm |
Northern Gas Networks |
low |
Brodie Close |
|
07/09/2024 9:04am |
18/09/2024 11:59pm |
Northern Gas Networks |
medium |
Rear Of Grays Terrace |
|
18/09/2024 8:00am |
20/09/2024 6:00pm |
BT |
low |
Mill Lane |
|
06/09/2024 2:39pm |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Sandiacres |
|
11/09/2024 8:00am |
13/09/2024 6:00pm |
BT |
medium |
Perth Avenue |
fill pothole with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
fill pothole with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
high |
Whitburn Road |
bitmac 2 potholes in carriageway |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
saw cut and excavate uneven S/C. renew 0.9x0.3 and 0.3 x 0.3 after flagging job |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
high |
Whitburn Road |
cut back and renew damaged flexible footway 5mx0.5m |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
fill pothole with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
high |
Whitburn Road |
bitmac 2 potholes in carriageway in channel |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
high |
Whitburn Road |
bitmac pothole in carriageway |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Whitburn Road |
cut back and renew damaged flexible footway 5mx0.5m |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
medium |
Waterloo Square |
3 potholes |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew 1 x 0.600 renew 2 x 0.900 relay 3 x 0.600 relay 1 x 0.900 ensure any large gaps are pointed with mortar/concrete fillet |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Stanhope Parade |
small pothole in road |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Whitburn Road |
cut back and renew damaged flexible footway 1m2 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Prim 27 |
replace 1 x 0.900 with C30 |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Whitburn Road |
reset kerb in footway |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Prim 27 |
remove 3 x 0.900 and replace with concrete |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Prim 27 |
replace 3 x 0.900 and 1 x 0.600 withC30 envelope 1 0.900 and relay |
11/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew 1 x 0.900 relay 1 x 0.900 and 2 x 0.600 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
top up 2 areas of depression |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Perth Avenue |
top up verge with top soil |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
relay 1 x 0.900 and 1x0.600 on concrete |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
renew 3 x 0.900 relay 2 x 0.600 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Perth Avenue |
renew gully cover |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Rear Of Stanhope Road And Birchington Avenue |
|
06/09/2024 2:19pm |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Perth Avenue |
fill pothole with bitmac |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Snowberry Grove |
remove tree base from tree |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Tynedale Road |
replace damaged kerb and 1no0.900 with concrete |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Access Road To Simonside Primary School From Glasgow Road |
use rapid set to repair kerb |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
saw cut 4 areas and remove damaged surface course. total 1.5sqm |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
medium |
Durham Drive |
|
14/09/2024 9:30am |
15/09/2024 3:00pm |
BT |
low |
Ayr Drive |
saw cut and remove damaged bitmac and renew patch 3 x 0.4 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Aberdeen Drive |
following kerb and flag job - renew surface course to remove any trips. saw cut to provide straight level edge |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Glasgow Road |
relay 1 x0.900 |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Gorse Avenue |
install access crossing and hard stand |
09/09/2024 8:00am |
20/09/2024 5:00pm |
South Tyneside Council |
low |
Lawnsway |
|
16/09/2024 9:30am |
18/09/2024 3:00pm |
BT |
low |
Moor Lane |
|
16/09/2024 8:00am |
18/09/2024 6:00pm |
BT |
low |
Foss Way |
|
16/09/2024 12:00am |
18/09/2024 11:59pm |
Northumbrian Water |
low |
Taunton Avenue |
renew 2 x 0.900 renew 1 x 0.600 relay 1 x 0.600 excavate and renew concrete approx 9sqm |
09/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Moor Lane |
cut back and renew damaged flexible footway 5mx1.2m |
06/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Moor Lane |
cut bsv, and renew damaged flexible footway 7mx1m |
06/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
South Lane |
|
19/09/2024 12:00am |
02/10/2024 11:59pm |
BT |
low |
Wharton Street |
|
04/09/2024 3:07pm |
13/09/2024 11:59pm |
Northern Gas Networks |
low |
Ravensbourne Avenue |
|
10/09/2024 12:00am |
23/09/2024 11:59pm |
Virgin Media |
high |
Langholm Road |
road closure at junction with station road in conjunction with closure on station road |
15/09/2024 8:00am |
06/10/2024 5:00pm |
South Tyneside Council |
low |
Station Road |
relay 2 x 10x5 bullnose kerb relay 5 x 0.600 relay 3 x 0.750 renew 1 x 0.600 relay 1 x 0.600x0.300 (replace with conc if required) renew 0.600x0.600 C30 renew missing fillet at BT box |
06/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
medium |
Meadowfield Drive |
|
16/09/2024 12:00am |
17/09/2024 11:59pm |
BT |
low |
Fhed 32 |
saw cut footpath each side of raise bitmac and renew surface course 1.8x0.9 |
06/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Mitford Road |
reset kerb and 1no 0.750 in footway |
06/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Lyndon Drive |
|
13/09/2024 8:00am |
17/09/2024 5:00pm |
BT |
low |
Chaucer Avenue |
|
12/09/2024 8:00am |
16/09/2024 6:00pm |
BT |
medium |
Marsden Road |
|
16/09/2024 8:00am |
18/09/2024 6:00pm |
BT |
medium |
West Drive |
|
11/09/2024 8:00am |
13/09/2024 6:00pm |
BT |
medium |
Henley Way |
Reset two gully cover and frames, inc patch surrounding tarmac, two-way temp lights |
10/09/2024 8:00am |
12/09/2024 5:00pm |
South Tyneside Council |
low |
Moreland Road |
|
11/09/2024 8:00am |
13/09/2024 5:00pm |
BT |
low |
Coast Road |
NPG to transfer supply to new feeder pillar |
11/09/2024 8:30am |
24/09/2024 11:59pm |
South Tyneside Council |
medium |
Aviemore Road |
|
03/09/2024 7:30am |
16/09/2024 11:59pm |
Northern Gas Networks |
low |
Coast Road |
NPG to transfer supply to feeder pillar |
11/09/2024 8:00am |
24/09/2024 11:59pm |
South Tyneside Council |
medium |
Blyton Avenue |
|
09/09/2024 12:00am |
13/09/2024 11:59pm |
Northumbrian Water |
medium |
Westoe Drive |
|
19/09/2024 12:00am |
25/09/2024 11:59pm |
Northumbrian Water |
low |
Prince Edward Road |
|
18/09/2024 8:00am |
25/09/2024 6:00pm |
Northern Powergrid |
medium |
Hindmarch Drive |
|
13/09/2024 12:00am |
17/09/2024 11:59pm |
Virgin Media |
low |
Harton Grove |
|
30/08/2024 9:50am |
13/09/2024 11:59pm |
Northern Powergrid |
low |
Ede Avenue |
Access crossing - 6 kerb x 2.5m Grass x 1.5m Flags x 2.1m Grass - at left side of property when looking from the road |
16/09/2024 8:00am |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Millais Gardens |
Access Crossing - 6 Kerb x 0.6m Flags |
12/09/2024 8:00am |
25/09/2024 5:00pm |
South Tyneside Council |
low |
West Avenue |
Access crossing - 4 kerb adjustment x 1.5 flags + 1.2 grass |
10/09/2024 8:00am |
23/09/2024 5:00pm |
South Tyneside Council |
medium |
Burdon Road |
|
13/09/2024 12:00am |
22/09/2024 11:59pm |
Northumbrian Water |
medium |
Barnes Road |
|
16/09/2024 12:00am |
27/09/2024 11:59pm |
CityFibre Metro Networks Ltd |
low |
Station Road |
|
16/09/2024 12:00am |
04/10/2024 11:59pm |
Northern Powergrid |
low |
Thornton Avenue |
|
13/09/2024 12:00am |
17/09/2024 11:59pm |
Virgin Media |
medium |
Garden Drive |
|
16/09/2024 12:00am |
18/09/2024 11:59pm |
Northumbrian Water |
medium |
Byron Avenue |
|
17/09/2024 12:00am |
23/09/2024 11:59pm |
Northumbrian Water |
low |
Westoe Road |
|
11/09/2024 12:00am |
13/09/2024 11:59pm |
BT |
low |
Prince Consort Lane |
|
02/09/2024 10:30am |
13/09/2024 11:59pm |
Northern Gas Networks |
low |
King Street |
|
11/09/2024 12:00am |
13/09/2024 11:59pm |
BT |
medium |
Glen Street |
install new manhole chamber and pipe work |
09/09/2024 7:30am |
20/09/2024 6:00pm |
South Tyneside Council |
medium |
Rear Of Hartington Terrace And Canterbury Street |
|
16/09/2024 12:00am |
20/09/2024 11:59pm |
Northumbrian Water |
medium |
Rear Of George Scott Street And Lawe Road |
|
16/09/2024 12:00am |
20/09/2024 11:59pm |
Northumbrian Water |
low |
August Place |
|
16/09/2024 12:00am |
20/09/2024 11:59pm |
Northumbrian Water |
low |
Gibson Court |
|
11/09/2024 8:00am |
13/09/2024 6:00pm |
BT |
low |
New Road |
|
11/09/2024 8:00am |
12/09/2024 6:00pm |
BT |
low |
Manet Gardens |
double access crossing (8 kerb) and hardstand (5.5 x 5) |
06/09/2024 8:00am |
20/09/2024 5:00pm |
South Tyneside Council |
medium |
Milton Avenue |
|
11/09/2024 8:44am |
17/09/2024 11:59pm |
Northumbrian Water |
low |
Roman Road |
|
21/08/2024 1:38pm |
16/09/2024 11:59pm |
Northern Gas Networks |
low |
Adair Way |
|
12/09/2024 12:00am |
18/09/2024 11:59pm |
Northern Gas Networks |
low |
Richardson Avenue |
|
13/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
medium |
Dean Road |
Installation of inductive detector loops on the carriageway |
13/09/2024 9:30am |
13/09/2024 3:30pm |
South Tyneside Council |
medium |
Whitburn Road |
Patching Works 24-25 - Whitburn Road Cleadon, 2 Way lights 09:00 - 17:00 |
16/09/2024 9:00am |
18/09/2024 5:00pm |
South Tyneside Council |
medium |
Forest Road |
|
12/09/2024 12:00am |
18/09/2024 11:59pm |
Northern Powergrid |
medium |
A1290 Washington Road Slip Roads East And West Of A19 |
lane closure required to facilitate the tm arrangement on thaeA1290/A19 slip road and downhill roundabout |
19/08/2024 8:00am |
06/12/2024 11:59pm |
South Tyneside Council |
medium |
Downhill Lane |
Single lane closure required to facilitate the TM arrangement on the A1290/A19 Slip Road & Downhill Roundabout |
19/08/2024 8:00am |
06/12/2024 11:59pm |
South Tyneside Council |
medium |
A1290 Washington Road Slip Roads East And West Of A19 |
Single lane closure required to facilitate the TM arrangement on the A1290/A19 Slip Road & Downhill Roundabout |
19/08/2024 8:00am |
06/12/2024 11:59pm |
South Tyneside Council |
low |
King George Road |
|
12/09/2024 12:00am |
18/09/2024 11:59pm |
Northumbrian Water |
low |
Ellison Street |
|
13/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
low |
Rear Of Frederick Street |
|
21/08/2024 8:10am |
24/09/2024 11:59pm |
Northumbrian Water |
low |
South Frederick Street |
|
10/09/2024 2:45pm |
23/09/2024 11:59pm |
CityFibre Metro Networks Ltd |
low |
Queen Street |
|
09/09/2024 2:06pm |
13/09/2024 11:59pm |
Northumbrian Water |
high |
Addison Road |
|
16/09/2024 7:30am |
19/11/2024 11:59pm |
Northern Gas Networks |
low |
Western Terrace |
|
16/09/2024 7:30am |
04/10/2024 11:59pm |
Northern Gas Networks |
low |
Mill View |
|
02/09/2024 9:00am |
18/10/2024 11:59pm |
Northern Gas Networks |
medium |
Mortimer Road |
|
04/09/2024 8:00am |
17/09/2024 5:00pm |
Grain Communications Ltd |
high |
Stanhope Road |
|
10/09/2024 8:00am |
16/09/2024 5:00pm |
Grain Communications Ltd |
low |
Concorde Way |
|
14/08/2024 10:32am |
19/09/2024 11:59pm |
Northern Gas Networks |
high |
Sea Road |
|
12/09/2024 12:00am |
12/09/2024 11:59pm |
Northumbrian Water |
low |
Fallow Road |
|
09/09/2024 7:30am |
20/09/2024 11:59pm |
Northern Gas Networks |
low |
Argyle Street |
|
18/09/2024 12:00am |
24/09/2024 11:59pm |
BT |
low |
Hall Gardens |
|
27/08/2024 9:10am |
11/10/2024 11:59pm |
Northern Gas Networks |
medium |
Milner Street |
|
17/09/2024 8:00am |
23/09/2024 5:00pm |
Grain Communications Ltd |
medium |
St Johns Terrace |
|
05/09/2024 9:00am |
13/09/2024 6:00pm |
Northern Powergrid |
medium |
Canterbury Street |
|
09/09/2024 9:30am |
13/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Holystone Industrial Estate |
installation of new gas main for new development |
02/09/2024 8:00am |
13/09/2024 5:00pm |
South Tyneside Council |
medium |
Oxford Street |
|
11/09/2024 8:00am |
17/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Collingwood Street |
|
11/09/2024 8:00am |
17/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Mile End Road |
|
16/09/2024 8:00am |
27/09/2024 11:59pm |
Northern Gas Networks |
low |
Front Street |
Remove old rounded pinkerbs and plain off - new pinkerbs and surface to be installed |
03/09/2024 8:00am |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Rear Of Marine Approach And Erskine Road |
back lane collapse, make safe with barriers |
06/08/2024 1:00pm |
04/10/2024 5:00pm |
South Tyneside Council |
medium |
Coronation Street |
|
15/09/2024 12:00am |
15/09/2024 11:59pm |
Northumbrian Water |
low |
Bamburgh Avenue |
|
13/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
low |
Lynton Avenue |
|
09/09/2024 10:27am |
13/09/2024 11:59pm |
Northern Gas Networks |
low |
Price Street |
|
16/09/2024 8:00am |
27/09/2024 11:59pm |
Northern Gas Networks |
low |
Croft Terrace |
|
16/09/2024 8:00am |
27/09/2024 11:59pm |
Northern Gas Networks |
medium |
Ellison Street |
Demolition works taking place within the former Hawthorn Leslie shipyard. Pavement and lane incursions proposed as safety exclusion zones during the demolition period. |
12/08/2024 8:00am |
31/10/2024 5:30pm |
South Tyneside Council |
medium |
Prince Consort Road |
|
16/09/2024 12:00am |
24/09/2024 11:59pm |
Northern Powergrid |
low |
Don View |
barrier off footway from 6-24 as dangerous |
24/07/2024 4:40pm |
29/11/2024 5:00pm |
South Tyneside Council |
medium |
Gordon Road |
|
13/08/2024 2:00pm |
16/09/2024 5:00pm |
Grain Communications Ltd |
medium |
Station Road |
|
17/09/2024 12:00am |
30/09/2024 11:59pm |
Northern Powergrid |
medium |
Bell Street |
|
11/09/2024 12:00am |
19/09/2024 11:59pm |
Northern Powergrid |
medium |
Coquet Street |
|
10/09/2024 12:00am |
18/09/2024 11:59pm |
Northern Powergrid |
medium |
Argyle Street |
|
05/09/2024 12:00am |
13/09/2024 11:59pm |
Northern Powergrid |
medium |
Talbot Road |
|
12/08/2024 8:00am |
13/09/2024 5:00pm |
Grain Communications Ltd |
low |
South Shields Footpath 543 |
|
09/09/2024 7:30am |
04/10/2024 11:59pm |
Northern Gas Networks |
medium |
Lizard Lane |
|
09/09/2024 7:30am |
18/10/2024 11:59pm |
Northern Gas Networks |
medium |
Grotto Road |
|
09/09/2024 7:30am |
15/11/2024 11:59pm |
Northern Gas Networks |
low |
Finchale Road |
remove concrete - renew with lean mix and bitmac 2.7x1.0 |
12/07/2024 8:00am |
20/09/2024 5:00pm |
South Tyneside Council |
low |
Access Road To 107-141 Hedworth Lane |
|
16/09/2024 8:00am |
23/09/2024 11:59pm |
Northern Gas Networks |
low |
Durham Drive |
24-25 footway improvement works. Remove flags and new formation of concrete and bitmac wearing course |
09/09/2024 8:00am |
15/10/2024 5:00pm |
South Tyneside Council |
low |
Ferry Street |
|
09/09/2024 10:50am |
13/09/2024 11:59pm |
Northumbrian Water |
high |
Lake Shore Road |
installation of new sewers and gullies and associated drainage |
22/07/2024 8:00am |
29/09/2024 4:30pm |
South Tyneside Council |
low |
Temple Park Road |
|
02/08/2024 7:30am |
12/09/2024 11:59pm |
Northern Gas Networks |
low |
Larch Avenue |
flags to flexible scheme |
02/09/2024 8:00am |
11/10/2024 5:00pm |
South Tyneside Council |
medium |
Sunderland Road |
installation of a puffin crossing |
19/08/2024 8:00am |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Prince Edward Road |
|
09/09/2024 8:38am |
20/09/2024 11:59pm |
Northern Powergrid |
low |
Quarry Road |
|
27/08/2024 2:45pm |
13/09/2024 11:59pm |
Northern Gas Networks |
low |
The Circle |
renew 4ms of concrete outside number 37. renew 0.5sm of concrete outside number 3 and renew concrete 0.5m outside number 6. meet cmalley on site |
23/05/2024 10:30am |
20/09/2024 5:00pm |
South Tyneside Council |
low |
Rear Of Broughton Road And Marine Approach |
to arrange barriers around depression pending investigation |
10/05/2024 2:00pm |
13/09/2024 5:00pm |
South Tyneside Council |
low |
Hedgeley Road |
|
27/08/2024 9:00am |
13/09/2024 11:59pm |
Northern Gas Networks |
medium |
Lynton Avenue |
concrete bay renewal programme, priority working |
05/09/2024 8:00am |
16/09/2024 5:00pm |
South Tyneside Council |
low |
Muirfield |
remove fence |
17/04/2024 7:45am |
27/09/2024 5:00pm |
South Tyneside Council |
low |
West Holborn |
Footpath to be closed due to unsafe structures in the footpath path near the Port of Tyne boundary wall. This is to remain closed until further solutions are presented to remedy this. |
25/03/2024 8:00am |
25/09/2024 5:00pm |
South Tyneside Council |
high |
Victoria Road West |
|
22/07/2024 7:30am |
18/10/2024 11:59pm |
Northern Powergrid |
low |
High Sandgrove |
make safe area of unsafe wall to no18, footway closure required |
27/02/2024 2:00pm |
27/09/2024 5:00pm |
South Tyneside Council |
low |
Rede Street |
make safe dangerous structure |
08/02/2024 5:00pm |
29/11/2024 5:00pm |
South Tyneside Council |
high |
Coast Road |
kerbline realignment on the coastal side of the carriageway (moving into the carriageway itself).
There will also be a couple of ped crossing renewals |
13/11/2023 8:00am |
13/12/2024 5:00pm |
South Tyneside Council |